Bridges
Construction of road over bridge in lieu of level crossing no.3A Dabhoi - Vishvamitri section of Western Railways (Government of India) with our own design.
LocationThe Road Over Bridge site is situated on Dabhoi-Vishvamitri Section of Western Railways near Pratapnagar Baroda
The works executed under the project are:
The work was awarded with contractors own design and running railway line
restrictions. The project was awarded on a lump sum Contract basis.
1. Construction of Road Over Bridge of 6.64 m height with Pre-cast R.C.C. Girders.
2. Construction of Pile foundation with 1200 mm diameter piles.
3. High grade R. C. C. Pile cap, Pier caps, Deck Slabs, Parapets etc.
4. Launching of Pre-cast RCC girders of 16.0 m span.
Project Cost
The Project cost was Rs. 21.65 Lac. (Year 1988-89)
Project Duration
24 Months
Construction of V.R.B. & Drainage Syphons Across Sujalam Sufalam Spreading Canal Between CH. 24.210 to 27.150 km.
LocationThe site of the work is situated across Sujalam Sufalam Spreading Canal between CH. 24.210 to 27.150 km near village Vadagam of Lunavada Taluka of Panchmahal District.
The works under the package are V. R. B. and Drainage Syphons consists of:
1. Construction of R. C. C. barrel type bridges.
2. Construction of R.C.C. Drainage Syphons.
3. Construction of Barrels of various sizes.
4. Construction of C. C. Block Aprons.
5. Rubble Pitching works.
6. Concrete Lining in bed and slopes.
Project Cost
The estimated cost of the Project is Rs. 511.60 Lacs. (Year 2004-05)
Project Duration
6 Months
Project is taken up under Sujalam Sufalam Spreading Canal Yojana to convey water from Kadana Dam across Mahisagar River to the water Scarcity areas of North Gujarat.
Construction of approaches with high embankment for road over bridges on Ahmedabad - Vadodara Express Highway
LocationThe site of Road Over Bridge is situated near village Vanthavali - Mehmedavad on Ahmedabad - Vadodara Express High way, ROB No.8.
The Package of the work consists of:
Construction of High Earthen Embankment work. Pipe culvers, WBM, Bituminus work, Subbase, LBM Ext.
As per MOST specifications.
Project Cost
The estimated cost of the package is Rs. 144.61 Lacs. (1988-89)
Project Duration
24 Months
Project was taken up for construction of Road Over Bridge on Ahmedabad - Vadodara Express Highway on behalf of Gujarat State Construction Corporation Ltd.
(A State Government under taking).
Earthwork and Bridges for Railway Siding
LocationThe site is situated near village Motikhavadi, of Sikka Taluka, Jamnagar District.
The works executed under the project are:
1. Construction of Earthwork and bridges for railway siding.
2. Construction of goods platform.
3. Area grading for raw material handling facilities.
4. Earthwork and retaining wall for Railway siding Phase-II.
5. Railway staff quarters Type -II.
Project Cost
The estimated cost of the Project was Rs. 60.30 lacs. (Year 1986-87)
Project Duration
12 Months
Project is for Earthwork, Area grading and Quarters including Railway Siding for Coastal DAP Project for Gujarat State Fertilizers Co. Ltd. under supervision of RITES.